U.S. patents available from 1976 to present.
U.S. patent applications available from 2005 to present.

System for controlling power consumption at a user of electric power

Patent 6772052 Issued on August 3, 2004. Estimated Expiration Date: Icon_subject April 7, 2019. Estimated Expiration Date is calculated based on simple USPTO term provisions. It does not account for terminal disclaimers, term adjustments, failure to pay maintenance fees, or other factors which might affect the term of a patent.

Patent References

3906242

Load shedding timer for a power management system
Patent #: 4213058
Issued on: 07/15/1980
Inventor: Townsend

Device control system
Patent #: 4489386
Issued on: 12/18/1984
Inventor: Breddan

System for rate-related control of electrical loads
Patent #: 5696695
Issued on: 12/09/1997
Inventor: Ehlers, et al.

Electrical power distribution monitoring system and method
Patent #: 5963457
Issued on: 10/05/1999
Inventor: Kanoi, et al.

Electrical power distribution monitoring system and method Patent #: 6061609
Issued on: 05/09/2000
Inventor: Kanoi, et al.

Inventors

Assignee

Application

No. 09647873 filed on 04/07/1999

US Classes:

700/291, Energy consumption or demand prediction or estimation700/286, Electrical power generation or distribution system700/297, Power supply regulation operation307/35Limit control

Examiners

Primary: Picard, Leo P.
Assistant: Lee, Douglas S.

Attorney, Agent or Firm

International Classes

G01R 2106
G05B 1502

Abstract

The invention relates to a system for controlling power consumption at a user of electric power, especially a dwelling supplies with power from a power plant. The invention is characterized in that the control unit is a main unit arranged to control the power consumption also based on an estimate of a historical consumption pattern at the user, so that the instantaneous consumption is reduced both in the periods in which the power load at the user is highest, and in the periods in which the historical consumption pattern of the user dictates that there is a high load, and that the main unit user is arranged to distribute the power consumption by means of a random function distributing the connection of the power consuming units over a given time interval, the random function being independent of energy plants and other users.

PatentsPlus Images
Enhanced PDF formats
loading...
PatentsPlus: add to cart
PatentsPlus: add to cartSearch-enhanced full patent PDF image
$9.95more info
PatentsPlus: add to cart
PatentsPlus: add to cartIntelligent turbocharged patent PDFs with marked up images
$18.95more info
 
Sign InRegister
Username  
Password   
forgot password?