Production and use of a premium fuel grade petroleum coke

Patent 6168709 Issued on January 2, 2001. Estimated Expiration Date: Icon_subject August 20, 2018. Estimated Expiration Date is calculated based on simple USPTO term provisions. It does not account for terminal disclaimers, term adjustments, failure to pay maintenance fees, or other factors which might affect the term of a patent.

Patent References

Re20011

1831719

1873024

2881130

3617480

3661543

3702816

3775290

3775294

3816084

More ...

Inventor

Application

No. 137283 filed on 08/20/1998

US Classes:

208/131, Soaking44/530, FUEL PRODUCT OF DEFINED SHAPE OR STRUCTURE44/607, CARBONIZED COMPONENT (E.G., COKE, ETC.)208/132With heating in tubular confined stream

Examiners

Primary: Yildirim, Bekir L.

Attorney, Agent or Firm

International Classes

C10G 009/14
C10L 007/00

Abstract

A premium "fuel-grade" petroleum coke is produced by modifying petroleum coking technology. Coking process parameters are controlled to consistently produce petroleum coke within a predetermined range for volatile combustible material (VCM) content. The invention includes a process of producing a coke fuel, the method comprising steps: (a) obtaining a coke precursor material derived from crude oil and having a volatile organic component; and (b) subjecting the coke precursor material to a thermal cracking process for sufficient time and at sufficient temperature and under sufficient pressure so as to produce a coke product having a volatile combustible material (VCM) present in an amount in the range of from about 13% to about 50% by weight. Most preferably, the volatile combustible material in the coke product typically may be in the range of from about 15% to about 30% by weight. The present invention also provides methods for (1) altering the coke crystalline structure, (2) improving the quality of the coke VCM, and (3) reducing the concentration of coke contaminants. Fuels made from the inventive coke product and methods of producing energy through the combustion of such fuels are also included. Finally, novel environmental control techniques are developed to take optimal advantage of the unique characteristics of this upgraded petroleum coke.

Other References

  • Fletcher, Peter, Delayed Coking, Chem. Engineer, Sep./Oct.(1983), 21-23
  • Janssen et al., Improved Coking Design Can Up Liquid Yields, Oil & Gas J. (Jun. 25, 1984) 79-83
  • Lieberman, Norman, Shot Coke: Its Origins and Prevention, Oil & Gas J. (Jul. 8, 1985) 45-46
  • Lieberman, Norman, Good Operating Techiques Improve Coker Yeild, Increase Gas-Oil Production, Oil & Gas J. (Mar. 10, 1986) 53-54
  • Lieberman, Norman, Procedure Reduces Coke Cuttng Time for Large Drums, Gas & Oil J. (Nov. 24, 1986) 85-86
  • Barnett, Jack, Desalters Can Remove More Than Salts and Sediment, Oil & Gas J. (Apr. 11, 1988) 43-49
  • Archuletta et al., Cooperative Corrosion Control and Treatment Program Proves Effective, Gas & Oil J. (Aug. 6, 1990) 60-68
  • Elliott, John, Design Operation Factors Can Up Coker Liquid Yields, Gas & Oil J. (Feb. 4, 1991) 41-44
  • Filtration Method Efficiently Desalts Crude In Commercial Test, Gas & Oil J. (May 17, 1993) 59-60
  • Bansal et al., Improve Your Coking Process, Hydrocarbon Processing (Feb. 1994) 63-66
  • Stefani, A., Debottleneck Delayed Cokers For Greater Profitability, Hydorcarbon Processing (Jun. 1996) 99-103
  • Harris, J.R., Use Desalting For FCC Feedstocks, Hydrocarbon Processing (Aug. 1996) 63-68
  • Dickenson, et al., Refiner Options for Converting and Utilizing Heavy Fuel Oil, Hydorcarbon Processing (Feb. 1997) 57-62
  • Auxillary Equipment, Corrosion Focus of Refining Meeting, Oil & Gas J. (Apr. 4, 1994)
  • Wagoner et al., Bruning Profiles For Solid Fuels, Amer. Soc. Mech. Eng. (Aug. 7, 1967) 1-8
  • Reid, William, Ash Chemistry And Its Effect In Broiler Furnaces, Elec. Power Res. Inst. (Dec. 2, 1980) 1-13
  • Burning Petroleum Coke: Boiler/Complex FGD or Fluid-Bed Combustor?, (Jul. 7, 1983)
  • Lieberman, Norman, Time for Coking Cycle Can Be Routinely Halved, Oil & Gas J. (Aug. 29, 1983) 39-44
  • Delayed Coking, Hydrocarbon Processing (Sep. 1984) 113
  • Kronenberger et al., Troubleshotting the Refinery Desalter Operation, Materials Performance (Jul. 1986) 9-17
  • Muzio et al., Dry Sorbent Emission Control Technologies, JAPC Assoc. (May 1987) 642-654
  • Deepwater Fires 100% Coke, Sells All FGD Gypsoum Product, Power (Oct. 1988)
  • Lieberman, Norman, Frequently Asked Questions On Coke Quality Answered, Oil & Gas J. (Mar. 27, 1989) 67-69
  • Makansi, Jason, Clean Air Act Amendments: The Engineering Response, Power (Jun. 1991) 11-60
  • Herzog et al., Feasibility, Modeling and Economics of Sequestering Power Plant CO2 Emissions In the Deep Ocean, Envior. Progress vol. 10 (Feb. 1991) 64-74
  • Elliott, J.D., Maximize Distillate Liquid Products, Hydrocarbon Proc. (Jan. 1992) 75-80
  • Sulfur Dioxide Control, Steam 40 (1992) Chapter 35
  • Fuel Ash Effects on Boiler Design and Operation, Steam 40 (1992) Chapter 20(ppl-28)
  • Sources of Chemical Energy, Steam 40 (1992) Chapter 8
  • Burners and Combustion Systems for Pulverized Coal, Steam 40 (1992) Chapter 13
  • Kent, James, Handbook of Industrial Chemistry, Published by Van Norstrand Reinhold (1992)
  • Rittenhouse, R.C., Action Builds On The Road To CAA Compliance (Part II), Power Eng. (Jun. 1992) 43-50
  • Batra et al, Desing Process Equipment for Corrosion Control, Chem. Eng. Prog. (May 1993) 68-76
  • Livengood et al., FG Technologies for Combined Control of SO2 and NOx, Power Eng. (Jan. 1994) 38-42
  • Torrens et al., Electric Utility Response to the Clean Air Act Amendments, Power Eng. (Jan. 1994) 43-47
  • Coke Quality, Oil & Gas J. (May 2, 1994) 114-115
  • Wolsky et al, CO2 Capture From the Flue Gas of Conventional Fossil-Fuel-Fired Power Plants, Envr. Progress vol. 13 (Aug. 1994) 214-219
  • Chue et al., Comparison of Activated Carbon and Zeolite 13X for CO2 Recovery From Flue Gas by Pressure Swing Adsorption, Amer. Chem. Soc. (1995) 591-598
  • Akai et al., Performance Evaluation of Fossil Power Plant With CO2 Recovery and Sequestering System, Energy Convers. Mgmt. vol. 36 Nos. 6-9(1995) 801-804
  • Coking/Catalytic Cracking/Catalytic Reforming, HydroCarbon Processing (Oct. 1996)
  • Refining 1996, HydroCarbon (Nov. 1996)
  • Sincero & G.A. Sincero, Environmental Engineering A Design Approach, Types of Control (625-633)
  • Bisio & A. Boots, Air Pollution Control Methods, The Wiley Encypoledia Energy and the Environment (vol. 1), 85-91
  • Kiely, Gerard, Environmental Engineering, (344-345) & (757-776)
  • Handbook of Petroleum Refining Processes, (Jul. 16-Jul. 29)
  • Delayed Cooking, Chapter 5 (52-64)
  • Kirk-Othmer Ency. of Chem. Tehc. 3rd Ed., vol. 17 (194-219)
  • Kirk-Othmer Ency. of Chem Tech., 4th Ed., vol. 18 (433-469)
  • Ency. of Chem. Processing and Design, vol. 10 (1-41
PatentsPlus Images
Enhanced PDF formats
loading...
PatentsPlus: add to cart
PatentsPlus: add to cartSearch-enhanced full patent PDF image
$9.95more info
PatentsPlus: add to cart
PatentsPlus: add to cartIntelligent turbocharged patent PDFs with marked up images
$16.95more info
 
Sign InRegister
Username  
Password   
forgot password?